The wellness amenity nobody got fired for choosing.
Seventeen years delivering branded-residence, hospitality and institutional wellness across Vietnam — the experience that makes the next project low-risk by default.
The site is built around the fear we retire for you.
Each path below leads to the proof a buyer in that role will need to convince the rest of the room. Choose the one that matches yours.
-
T1 · For
Real-estate developers
The flagship amenity slips, off-standard, on launch week.
On-time delivery across 40+ branded-residence amenities.
-
T1 · For
5-star hotels & resorts
An audit failure, or a viral complaint, on your watch.
Operator-approved across nine international flags.
-
T2 · For
Premium residential
Being sold to, instead of quietly served.
Architect-led private installs across HCMC, Hanoi, Danang.
-
T2 · For
Gym & club operators
Downtime that costs members.
4-hour metro response, parts on the shelf.
-
T2 · For
Corporate wellness
A budget that can't be defended in committee.
Forwardable business case in every brief.
-
T3 · For
Education & academies
Equipment your team can't run.
NASM-credentialed curriculum, locally delivered.
-
T3 · For
Institutional & public-sector
A tender that doesn't survive procurement scrutiny.
Procurement-ready documentation, standards-grade.
-
T3 · For
Brand partners
A local distributor that dilutes the brand.
Seventeen years protecting principal brand standards in Vietnam.
-
T2 · For
Service & maintenance
Equipment down, no parts, no answer.
Named technician within 24 hours, anywhere we install.
Seventeen years is not a slogan. It is the evidence that the risk has already been retired.
- 01 · Seventeen years operating
- Vietnam's entire modern hospitality build-out — including the conditions a new supplier has never been tested by — has happened on our watch.
- 02 · Two decades of installs
- The integration mistake you are worried about, we already made — once, years ago — and built the process that prevents it.
- 03 · Renewed brand exclusivities
- Principal brands renew with partners who do not fail them locally. Ours has held for over a decade.
- 04 · Accumulated reference base
- Whatever your project type, the closest analogue is something we have already delivered, with the metrics to forward.
- 05 · Institutional memory
- Your team turns over. Our knowledge of your building does not.
- 06 · Documented prevention
- A published common-failure list is our authority — candour, not adjectives.
The principal brands you trust are the principal brands that have renewed with us — for over a decade.
-
Technogym
17yAuthorised distribution and integration partner across Vietnam — branded-residence, hospitality and elite-club channels.
Partner since 2009
-
Life Fitness
14ySingle-source partner for commercial cardio, strength and connected ecosystems across hospitality and operator channels.
Partner since 2012
-
Hammer Strength
12yPerformance-segment partner for hotel athlete training rooms, premium clubs and elite-sport academies.
Partner since 2014
-
NASM
9yAccredited certification and continuous-education delivery for IWC clients and Vietnam's wellness workforce.
Partner since 2017
-
Hyperice
6yRecovery and longevity integration partner — bridging in-room amenity, spa, and clinical wellness offers.
Partner since 2020
Three projects, attributed and quantified.
Branded-residence wellness amenity, Saigon Riverside
The amenity that was meant to anchor the development's marketing was three months from launch with no equipment partner under contract and the brand standard unresolved.
Illustrative — final asset pending validationPrivate residence, District 2
A private client wanted a hotel-grade wellness room indistinguishable from the architecture of the house — and a service relationship the household staff would carry, not the client.
Illustrative — final asset pending validationResort wellness refurbishment, Danang coast
A flagship beach resort needed to refurbish its wellness floor without a single day of guest-facing closure during peak season — and pass an operator audit at the back end.
Illustrative — final asset pending validationThe service promise we publish.
A specific, falsifiable promise — written this way because we publish what we keep, and we keep what we publish.
Read the full SLA- 01
4-hour metro response
Across Ho Chi Minh City, Hanoi and Danang — first response, on site, within four working hours.
- 02
Named technician within 24h
Anywhere we install, nationally. The technician is named in your operations manual on day one.
- 03
Parts inventory in-country
The components most likely to fail are the components we already hold. Lead times measured in hours, not airfreight cycles.
- 04
Quarterly evidence to your FM
Response, uptime, parts utilisation — reported on a single page, every quarter, against the SLA.
Five stages. Every one carries a milestone you can hold us to.
- 01
Discovery
We arrive having already read your operator's brand book and your architectural intent. The first meeting is a working session, not a pitch.
- You get
- A read of the brand standard, a delivery-risk register, and a shortlist of comparable projects.
- We need
- Operator standards, current architectural package, programme dates.
- Milestone
- Shared risk register signed off
- 02
Specification & standards
Equipment list resolved against the brand standard. Specification lands inside your BIM and M&E packages, not as a parallel brief.
- You get
- Spec sheets, BIM models, M&E coordination drawings.
- We need
- Architect's package, contractor's preliminaries.
- Milestone
- Spec lock-up
- 03
Delivery plan
An install plan integrated with the contractor's critical path, with schedule risk surfaced inside the first design week, not on launch week.
- You get
- Integrated delivery schedule, contingency plan, parts staging.
- We need
- Updated programme, site-access protocols.
- Milestone
- Programme integration
- 04
Install
Phased install around your sequence. For operating sites, zoned overnight work; for new-build, integrated handover.
- You get
- Daily install log, condition reports, snag-list working tracker.
- We need
- Site access, services live, condition handover.
- Milestone
- Snag-list close-out
- 05
Asset-life support
Service contract activated from day one. Named technician listed in your operations manual. Quarterly evidence to facilities.
- You get
- Maintenance regime, parts inventory, quarterly report, refresh plan.
- We need
- PPM access windows, operator escalation protocols.
- Milestone
- First quarterly review delivered
One asset, written for the room you are not in.
The decision will be argued in a meeting we are not in. This is the brief that goes with the person arguing for us.